合同视角下武易高速公路土建劳务合作风险分担研究
|
常清
|
云南长基工程建设有限公司,云南昆明,650000
|
摘要:武易高速公路建设规模大、施工周期长,土建劳务合作作为项目推进的核心环节,其风险分担的科学性直接影响项目成败与劳务双方权益。本文从合同视角切入,聚焦武易高速公路土建劳务合作场景,系统探讨风险分担的意义、目的与实施策略。研究指出,合理的风险分担可保障劳务双方合法权益,助推施工高效推进,完善行业管理体系。其核心目的在于通过合同明确风险责任边界、提升整体防控能力,最终实现多方共赢。基于此,本文提出构建科学风险评估机制、细化合同条款明确分担比例、建立动态监控调整体系等策略。研究成果可为武易高速公路项目优化劳务合作管理提供直接参考,也为同类高速工程的劳务风险管控提供合同层面的实践借鉴,助力提升高速公路建设领域劳务合作的规范化水平。
关健词:合同视角;武易高速公路;土建劳务;合作;风险分担
|
Research on Risk Sharing in Civil Engineering Labor Cooperation
for the Wuyi Expressway from a Contract Perspective
|
Qing Chang
Yunnan Changji Engineering Construction Co., Ltd.,Kunming Yunnan 650000,China
|
Abstract: The construction of the Wuyi Expressway is characterized by its large scale and long duration. Civil engineering labor cooperation, as a core component of project advancement, relies on the rationality of risk sharing, which directly influences project success and the rights of both labor parties. This paper adopts a contract perspective, focusing on the context of civil engineering labor cooperation for the Wuyi Expressway, and systematically explores the significance, objectives, and implementation strategies of risk sharing. The study indicates that reasonable risk sharing can protect the legitimate rights and interests of both labor parties, promote efficient project progress, and improve industry management systems. Its core objectives include clarifying risk responsibility boundaries through contracts, enhancing overall risk prevention capabilities, and ultimately achieving win-win outcomes for all stakeholders. Based on this, the paper proposes strategies such as establishing a scientific risk assessment mechanism, refining contract terms to specify sharing proportions, and implementing a dynamic monitoring and adjustment system. The research findings can provide direct references for optimizing labor cooperation management in the Wuyi Expressway project, as well as practical guidance at the contract level for risk control in similar high-speed engineering projects. This contributes to enhancing the standardization of labor cooperation in the field of expressway construction.
Keywords : Contract perspective; Wuyi Expressway; Civil engineering; Labor cooperation; Risk sharing
参考文献 [1]郭思延.基于合作博弈视角的工程总承包联合体利益分配研究[D].福建农林大学,2024. [2]杨荇.基于银行视角的高铁 PPP 模式风险分担机制研究[D].北京交通大学,2023. [3]张宽.公共租赁住房 PPP 项目风险分担研究[D].中南财经政法大学,2021. [4]严玲,王帅,严敏.全过程风险分担视角下合同柔性的结构维度与量表开发[J].重庆大学学报(社会科学版),2021,27(02):94-108. [5]刘柳.风险分担对承包人尽善履约行为的影响[D].天津理工大学,2019.
|
|
|
论文收录证明 / 文献检索报告
Document Retrieval Certificate / Proof of Publication Indexing
作者贡献声明 / 贡献确认书
Author Contribution Statement / Certificate of Authorship Contribution
同行评审报告 / 评审意见
Peer Review Report / Peer Review Comments
利益冲突
Conflict of Interest
作者声明不存在任何利益冲突。
The author declares no conflict of interest.
|
|